Sort by
Refine Your Search
-
Program
-
Field
-
date in May 2026. 2. WORK PLAN AND WORKPLACE: The main objective of the work plan is to assess the ecological, economic, and social relevance of Blue–Green Infrastructure in the Sorraia River basin, with
-
(non–degree-awarding) courses (BI), for a length time of 6 months, possibly renewable up to a maximum of 12 months, scheduled to start on April/2026). 2. WORK PLAN AND WORKPLACE: The scholarship aims
-
, the grant awarded will have a maximum duration of 12 months. 2. WORK PLAN AND WORKPLACE: Development of the concept of transformative change applied to the restoration of ecosystem services. Development
-
period of 12 months, possibly renewable up to a maximum of 36 months, scheduled to start on March 2026. 2. WORK PLAN AND WORKPLACE: The project will investigate the developed algorithms and methods