Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Field
-
the reference BiodivNBS/0007/2023 and DOI: https://doi.org/10.54499/BiodivNBS/0007/2023 , financed by Foundation for Science and Technology, I.P , through national funds, under the European Co-financed
-
the University of Porto (FEUP), under the scientific supervision of Professor Ana Rosanete Lourenço Reis. Grant duration: Initial duration of 6 months, with the predicted starting date in April 2026
-
the predicted starting date in March 2026, on an exclusive basis eventually renewable but never exceeding the the end of the project.If the contracting procedures do not allow the scholarship to have a minimum
-
Industry, with the reference ERA-MIN3/0002/2023 with e DOI 10.54499/ERA-MIN3/0002/2023 (https://doi.org/10.54499/ERAMIN3/0002/2023 ) funded by the Fundação para a Ciência e a Tecnologia, I.P., through
-
the scientific supervision of Professor José Carlos Magalhães Duque da Fonseca. Grant duration: Initial duration of 3 months, with the predicted starting date in april 2026, on an exclusive basis eventually
-
the Sustainability of Raw Materials Industry” with the reference ERA-MIN3/0002/2023 with e DOI 10.54499/ERA-MIN3/0002/2023 (https://doi.org/10.54499/ERAMIN3/0002/2023 ) funded by the Fundação para a Ciência e a
-
, economical, environmental and social assessments; develop new H2 services and port business models; development of the decision support tool to facilitate selection of H2 technologies. Furthermore
-
supervision of Professor Luísa Maria Hora de Carvalho. Grant duration: Initial duration of 3 months, with the predicted starting date in March 2026, on an exclusive basis eventually renewable but never
-
. Tânia Filomena Castro Valente Silva and Professor Doctor Helena Isabel Sousa Passos. Grant duration: Initial duration of 06 months, with the predicted starting date in July 2026, on an exclusive basis
-
of Dr.António Manuel Azevedo Ferreira, Dr. Vítor Jorge Pais Vilar and Dra. Lúcia Maria da Silveira Santos. Grant duration: Initial duration of 08 months, with the predicted starting date in March 2026