-
well as the other conditions specified in the Annex to the NCN Council Resolution No. 60/2019 of June 13, 2019: https://www.ncn.gov.pl/sites/default/files/pliki/uchwaly-rady/2019/uchwala60_2019-zal1.pdf. Permission
-
interaction model and introducing new hypotheses. The Candidate (F/M) will be the main leader of the cosmic showers simulation and will be free to test own ideas in the project context. The Candidate (F/M) will
Enter an email to receive alerts for simulation "https:" positions