-
date in May 2026. 2. WORK PLAN AND WORKPLACE: The main objective of the work plan is to assess the ecological, economic, and social relevance of Blue–Green Infrastructure in the Sorraia River basin, with
-
period of 12 months, possibly renewable up to a maximum of 36 months, scheduled to start on March 2026. 2. WORK PLAN AND WORKPLACE: The project will investigate the developed algorithms and methods
Enter an email to receive alerts for design "https:" "https:" "https:" positions