-
design effort in developing specifications, control systems design, system integration and implementation, and the realisation of power management of load/storage systems required for turbine testing
-
of FOG deposition mechanisms in wastewater systems Design and optimisation of FOG management devices Planning and oversight of field trials Extensive experience in sample characterisation Capability in
-
will bring: Demonstrated ability to work in laboratory based experimental research and participate in scaled-up prototype testing and field demonstration with project team and industry partners
Enter an email to receive alerts for project-management "https:" positions