Sort by
Refine Your Search
-
Employer
-
Field
-
and testing of NILM hardware and software (4 weeks) a) Propose a test setup for the NILM module using high-power signals, including equipment list and required instrument software. b) Develop
-
be based on biocompatibility with human blood.Steady and oscillatory shear tests will be carried out using a rotational rheometer. The nonlinear response of the samples will be analyzed through large
-
tasks of this plan are: 1) Identification of 3D Scanning technologies; 2) Testing of scanning technologies and benchmarking in the specific context of the project; 3) Creation of tutorials
-
training and experience to the objectives of the work to be developed; - The candidate should have relevant experience in software development, particularly in supporting data integration, user management
-
with industrial application using sensor systems, systematized software production and scientific production and writing, designing, building and testing laboratory prototypes for predictive maintenance
-
tools and universal testing machines; 2) have experience using industrial metrology equipment; 3) have experience performing mechanical characterization tests and destructive testing;4) have experience
-
Escola Superior de Design, Gestão e Tecnologias da Produção de Aveiro - Norte da Universidade de Aveiro | Portugal | about 2 months ago
preparation and model training Product design study Start of characterization tests and validation of the behavior of the final solution Contribution in the publication of scientific articles, as
-
, of FCT I.P.. At the time of the respective hiring, candidates must prove that they are enrolled in one of the following courses: PhD in the field of Civil Engineering, or in related fields; In a Course
-
structural characterization; magnetic and structural analysis; preliminary experience with finite-element simulations; and experience in developing hardware and software for control and data acquisition as a
-
the various project partners and specified in the previous phase. 3- Testing the applications and creating demonstrations and dissemination activities for the project partners and external entities. 4