Sort by
Refine Your Search
-
to the activities of the SIR-V2G project wich primary objective is to address the challenges arising from the large-scale integration of electric vehicles (EVs) into distribution networks by developing smart
-
). Reuse of infrastructure components (e.g., pavement stones, concrete kerbs, sewage pipes) is gaining momentum, but scaling remains difficult: supply and demand rarely align in time, place, and
-
systems, or a related field Clear interest in industrial diagnostics, AI, and hardware/software co-design Good command of English (spoken and written) Strong analytical and documentation skills Experience
Searches related to decentralized control for large scale systems
Enter an email to receive alerts for decentralized-control-for-large-scale-systems positions