-
responses Technical Responsibilities Experimental Rig Construction: Design and build novel experimental setups for either free-flight behavioral assays with high-speed tracking capabilities or tethered flight
-
, the beautiful, 290-acre main campus is also a Nevada State Arboretum. The University’s physical infrastructure is expanding with ongoing construction of the newly named John Tullock Business Building, set to open
Searches related to structure
Enter an email to receive alerts for structure positions