156 structures-"https:"-"https:"-"https:"-"https:"-"https:"-"https:"-"UCL" positions at The Ohio State University
Sort by
Refine Your Search
-
Listed
-
Category
-
Field
-
testing and programming as part of the hardware install certification process for all construction projects requiring access control hardware components, and systems troubleshooting as part of the hardware
-
managed by FOD Design and Construction Physical Requirements: Must be able to push and pull 70 lbs. and distinguish colors. Climb and stand on ladders for extended periods of time. Unusual Work Conditions
-
standards 12b, i, j, l) To understand the formats, components, and accepted standards for an integrated and comprehensive set of interior construction documents (CIDA standards 15a, h) Responsibilities
-
of Environment and Natural Resources. The two institutions have their own administrative leadership and governance structure, but partner through several shared services, including security, campus recreation
-
university building design standards (BDS) related to the maintenance and repair of building systems and equipment; basic understanding of the project process as managed by FOD Design and Construction Physical
-
approaches to fit the College’s structure. Appreciation for the diversity of public health research across divisions and the ability to apply a broad lens to support all areas. Skilled communicator and
-
FOD Design and Construction Physical Requirements: Must be able to push and pull 70 lbs., distinguish colors, and climb ladders. Unusual Work Conditions: May work in hot, cold, dusty, or dirty
-
, tech-enabled environment. Facilitate structured debriefing sessions using evidence-based models (e.g., PEARLS, Debriefing for Meaningful Learning) to help students reflect on performance and integrate
-
, social workers or therapeutic recreation specialists who work within a specific team structure to offer inpatient or outpatient rehabilitation services. These services are offered to the acute-care
-
of building systems and equipment, and demonstrated understanding of the project process as managed by FOD Design and Construction (FDC); successful completion of probationary period includes demonstrated