176 structural-engineering-"https:" "https:" "https:" "https:" "UCL" "UCL" positions at European Space Agency
Sort by
Refine Your Search
-
cells; Electrical Power management and conditioning systems; Nuclear power system engineering; Power distribution and protection techniques & technologies; Electrical harness design and engineering; EMC
-
systems. Candidates interested are encouraged to visit the ESA website: http://www.esa.int and https://www.esa.int/Applications/Satellite_navigation Field(s) of activity for the internship Within
-
domains at subsystem and instrument level: Optical systems: design, engineering and verification in all optical related areas, including optical component technology, micro-optics, fibre and passive
-
Location ESTEC, Noordwijk, Netherlands Our team and mission The Thermal Division is responsible for the technical and strategic management in the following domains: Thermal engineering, design
-
cells; Electrical Power management and conditioning systems; Nuclear power system engineering; Power distribution and protection techniques & technologies; Electrical harness design and engineering; EMC
-
domains at subsystem and instrument level: Optical systems: design, engineering and verification in all optical related areas, including optical component technology, micro-optics, fibre and passive
-
Location ESTEC, Noordwijk, Netherlands Description Lead Payload Engineer in the Sunrise Project within the LEO Satellites Programme Office in the Satellite Programmes Department within
-
are encouraged to visit the ESA website: http://www.esa.int Field(s) of activity for the internship Topic of the internship: Support Development of InCubed tools to support the programme implementation In your
-
interested are encouraged to visit the ESA website: http://www.esa.int Field(s) of activity for the internship Topic of the internship: Galileo System Test Engineering As part of the System Assembly
-
Engineers who are in charge of the flight operations of the Solar Orbiter spacecraft. Operations planning is performed with the Mission Planning System on a weekly basis, which consists of validating and