102 structures "https:" "https:" "https:" "https:" "https:" "University of Kent" positions at Carnegie Mellon University
Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Field
-
Structures: the formal study of mathematical proof itself, as a subject in computational complexity, type theory, metamathematics, logic, and beyond. What is the space of mathematical truth, and what proofs
-
to support student recruitment, mentoring, internships, and career development. Build structured alumni-student engagement opportunities (e.g., mentoring programs, speaker events), facilitate alumni
-
of data-supported research Conduct structured interviews with D.C.-based experts and policymakers Manage multiple tasks and meet deadlines Editorial Skills Exceptional organizational skills Strong writing
-
, interaction flow, navigation structures, and visual design enhancements as necessary. Conduct heuristic assessments for LSFI tools and participating Ed Tech company products to ensure they meet basic usability
-
departments to enhance incentives --student fellowships, promotion and tenure recognition, faculty leave, IP structures-- to mobilize students and faculty into action. Expanding relationships with a broad range
-
(college, university, hospital, etc.) setting preferred. One year apprentice level experience in electrical, plumbing, HVAC and/or structural trades preferred. Additional experience in HVAC system and DDC
-
an eye towards cost control and environmental sustainability. In this role, you will perform general carpentry work such as: construction of partitions; installation of T-bar ceilings, floor tile, trim and
-
collaborative. Computer Science at Carnegie Mellon is also distinctive for our research style, educational programs, commitment to diversity, culture and organizational structure. We are seeking a Research
-
. Manage course activity online in Canvas, including but not limited to supervising student submissions, helping to ensure appropriate structure, format, and best practices are followed in all submitted
-
Melwood building are scheduled to begin in earnest in early May 2026, and are planned for specific spaces not the whole building. The manager will work closely with the construction manager, contractors