Sort by
Refine Your Search
-
duties include contacting participants (call, email, text) to schedule in-person clinic appointments, to remind them of upcoming visits, and to complete study activities; preparing specimen collection kits
-
duties include contacting participants (call, email, text) to schedule in-person clinic appointments, to remind them of upcoming visits, and to complete study activities; preparing specimen collection kits
-
regulatory submissions, and ensure institutional Review Board renewals are completed. Assemble study kits for study visits, monitor scheduling of procedures and charges, coordinate documents, and attend
-
Information Schedule: Full-time Job Code: 4111 Employee Status: Fixed-Term Grade: H Department URL: http://www.law.stanford.edu/ Requisition ID: 106738 Work Arrangement : Hybrid Eligible
-
hires must successfully pass a background check prior to starting work at Stanford University. Additional Information Schedule: Full-time Job Code: 1384 Employee Status: Fixed-Term Grade: H99 Requisition
-
hurdles to system expansion and changes (which occur regularly). Arrange, schedule, and execute twice-to-four-times-weekly research sessions, including regular interaction with persons with paralysis and
-
algorithmic performance. For instance, the scheduling problems that an electric grid operator faces will change daily, but not drastically: although demand will vary, the network structure will remain largely
-
: The appointment is scheduled to begin on September 15, 2025, and last for one year; a later start date may also be possible. The position is renewable for a second year, contingent on satisfactory performance
-
scope of the job or level of responsibility. Employees may also perform other duties as assigned. Additional Information Schedule: Full-time Job Code: 4943 Employee Status: Regular Grade: E Requisition ID
-
applications to be submitted by April 1, 2025. The appointment is scheduled to begin on September 1, 2025. The initial appointment is for up to 12 months. The position is renewable up to June 30, 2027