Sort by
Refine Your Search
-
Listed
-
Program
-
Employer
-
Field
-
automotive networks Explore and implement reinforcement learning algorithms for secure, real-time traffic scheduling and flow reconfiguration Conduct testbed-based evaluations using automotive-grade hardware
-
be scheduled before the end of 2025. You have a background in the humanities and hydrology, and ideally you have an experience with a transdisciplinary project combining hydrology and a participatory
-
emanates from the scientific council of the Observatoire de la Côte d'Azur. Schedule • closing on december 1st, 2025 - result begining of april 2026 - start on october 1st, 2026 (flexibility is possible
-
and medium-scale computing environments (Linux, job schedulers, parallel computing). • Familiarity with data analysis, visualization, and handling large scientific datasets. • Ability to run, adapt
-
model to accelerate exploration. 4. Analyze the impact of local decisions (scheduling, resource allocation, layout) on overall performance through simulations and probabilistic sensitivity analyses. 5
-
material, including scheduling interviews, conducting them, transcribing, archiving, and making verbatim transcripts available to the team. Most interviews outside Île-de-France will be held online. Short
-
administration), the bash language, and computer task schedulers for computing clusters. • Practical knowledge of the Python language and its scientific computing and data analysis libraries. Website
-
working on the list of 25 features and bugs identified by the pioneer teachers. The aim of the next co-design sessions, scheduled for October to December 2025, will be to ensure that teachers are satisfied
-
devices and associated electronics, and support for experiments during the VAMOS experimental campaigns at GANIL -The analysis of data obtained during experiments scheduled during the VAMOS experimental
-
for an engineer to lead the experimental measurements on these instruments. Additional one-off measurements, carried out at the synchrotron, may also be scheduled. *Perform X-ray photoemission measurements, as