-
. This is for a two-year contract until 30/09/2027 to develop and carry out field trials; survey remote sites; install instruments, data loggers and transmission systems; and analyse and interpret data. We
-
of railway infrastructure, particularly overhead line equipment structures and installations. This is for a two-year contract until 30/09/2027 to develop and carry out field trials; survey remote sites
-
qualitative and quantitative data analysis. Proficiency in programming (e.g., JavaScript, Python, React for iOS/Android) is important. Additional strengths would include experience with physiological sensing
-
the Swanbarton energy management system, allowing the rapid incorporation of SLFBs into future microgrids. Gham Power is a solar power company that has deployed over 4,000 projects including in remote areas in