Sort by
Refine Your Search
-
of LISA PA&S Manager and will be part of the LISA Core Team. While reporting hierarchically to the Head of the Science PA&S Office, you will report functionally to the LISA Project Manager, Science
-
and integration within the project timeline; managing the development of internal simulation tools that will complement the Phase 1 tools to ensure that ESA develops a unified coherent testbed for
-
to the design, development and deployment of the satellite platform of the Secure Connectivity Space Segment. Duties Your tasks and responsibilities will include: contributing to managing engineering activities
-
relevant project teams. You will lead the Sentinel-2 and Sentinel-3 end-to-end system performance activities from a technical point of view, managing the in-flight performance verification for the first
-
performing the necessary design trade-offs (including the margin policy) to ensure that the mission performance will be achieved; Establishing and maintaining the system performance budgets throughout
-
studies for missions to the Moon (surface and orbiters), including preparation, organisation and oversight of both ESA internal study work, Concurrent Design Facility (CDF) studies and industrial pre-Phase
-
focuses on instrumentation development for microgravity experiments and exploration, environmental control and life support system (ECLS) design, engineering and verification and in situ resource
-
interaction with other Ariane 6 projects within the Department to guarantee coordination, synergies and shared priorities within the overall Ariane IPT; interfacing with entities providing assistance
-
, you will be responsible for tasks relating to the design, development and deployment of the payloads of the Secure Connectivity Space Segment. Duties Your tasks and responsibilities will include
-
. The project will demand a high degree of flexibility and creativity, in line with the innovation focus of Spaceship work. 4. Expected Outcomes The team member will help advance a specific Spaceship EAC project