Sort by
Refine Your Search
-
Listed
-
Category
-
Employer
-
Field
-
stimulating working environment The planned start date is 1 November 2025, latest As part of both VIB-UAntwerp Center for Molecular Neurology and the Brussels Center for Immunology, the applicant will benefit
-
and cooperation. What we offer By the end of the PhD, the successful candidate will graduate with a highly competitive set of experimental and scientific skills, such as experimental design, animal
-
distribution of active sites and guide future catalyst design. Structural insights will be correlated with catalytic performance metrics, provided by project partners, to identify the role of material structure
-
collaboration with the candidate, a detailed research plan will be drafted aiming to unravel mutational robustness and evolvability in Escherichia coli. The work will involve genome editing (CRISPR), genetics
-
, funded by the European Commission’s Horizon Europe programme. You will be based in Brussels, Belgium and will enroll as a PhD student at Vrije Universiteit Brussel (VUB). The main line of research will be
-
in a dedicated training plan For further information, please contact Prof. Marcus Völp at critix- Your profile Qualification: Master in Computer Science and/or Cybersecurity or equivalent degrees with
-
deposition and characterization (e.g., atomic layer deposition, ellipsometry), the design and fabrication of microhotplates, and the development of novel lithographic patterning methods, for instance starting
-
) PhD degree at Ghent University) can apply. Exchange students cannot apply for this scholarship; This program is meant for students at the beginning of their PhD. To a limited extent, PhD students
-
can be renewed once for another two-year period. The planned start date is 1 October 2025 or as soon as possible after that date. Your monthly scholarship amount is calculated according
-
. What we offer We offer a doctoral scholarship for a period of 1 year. Following a positive evaluation, the scholarship will be renewed for another 3 years. The planned start date is 1 September 2025