184 post-doc-soil-structure-interaction Postdoctoral positions at University of Oxford
Sort by
Refine Your Search
-
Listed
-
Country
-
Field
-
(central Oxford). The post is funded by UKRI EPSRC and is fixed term for 24 months, with possible extension for an additional 12 months. You will be contributing to a new EPSRC-funded project focused
-
(the Digital Critical Friends, DCFs) which is independently Chaired and plays an important role in scrutinising and advising on developments within the OpenSAFELY tools and service. The post holder will work
-
We are seeking a full-time Postdoctoral Research Assistant to join RADlab at the Department of Engineering Science (central Oxford). The post is funded by UKRI and is fixed-term (1st January 2025
-
Reporting to Professor Fernanda Pirie, the post holder will be a researcher on the project entitled ‘‘Tibetan law: the socio-historic exploration of a unique legal system”. The postholder will have
-
variety of social and sports clubs Hybrid working is available with minimum of 3 days onsite per week for a full-time post. Expectations include attending in person monthly team meetings. About the Role
-
We are looking for an excellent post-doctoral candidate with a PhD / DPhil (or near completion) in quantum optics, solid state quantum physics, magnetic resonance or related areas. The successful
-
The post holder will develop computational models of learning processes in cortical networks. The research will employ mathematical modelling and computer simulation to identify synaptic plasticity
-
at the microscale. The post holder will be primarily a member of the engineering research group with responsibility for development of fluid walls technology for advanced cell biology assays in close collaboration
-
and Prof Paul Shearing. The post is funded through a strategic research partnership and is fixed term for up to 2 years. To support the programme, the post holder will be required to carry out research
-
Oxford. The post is funded by The Faraday Institution and is fixed term to 30 September 2026. This project addresses the need for process control on electrode fabrication lines for lithium-ion batteries