Sort by
Refine Your Search
-
for a given coastline morphology and flood hazard profile to minimise inland inundation, assessed using coupled CFD and inundation modelling? - How can the optimisation process balance flood reduction
-
PhD: Developing Robust Drought Projections for Resilient UK Water Resource Futures. Award Summary Full PhD tuition fees at the UK home student rate (UK students and EU students with settled or pre
-
. Working with directly with the British Geological Survey and project partners in industry including Gateshead Council (and Project Groundwater Northumbria) and the Mining Remediation Authority, this PhD
-
, or expect to gain, a minimum 2:1 Honours degree or international equivalent in a subject relevant to the proposed PhD project (inc. computing, mathematics, engineering etc.). Enthusiasm for research
-
with mechanical testing of the alloys in hydrogen rich environments will be used. The ReNU+ CDT has hosted a number of online pre-application workshops to provide guidance on the application process
-
You must have, or expect to gain, a minimum 2:1 Honours degree or international equivalent in a subject relevant to the proposed PhD project (inc. computing, mathematics, engineering etc.). Enthusiasm
-
Eligibility Criteria You must have, or expect to gain, a minimum 2:1 Honours degree or international equivalent in a subject relevant to the proposed PhD project (inc. computing, mathematics, engineering etc
-
Award Summary Full PhD tuition fees at the UK home student rate (UK students and EU students with settled or pre-settled status). An annual stipend equivalent to the UKRI doctoral stipend (estimated
-
for small patches of skin. In this project we will employ the use of a 3D printer to produce prototype devices which could be attached onto any topical product to adjust the nozzle size, and thus, the FTU
-
. This PhD project offers the opportunity to spearhead cutting-edge research into how drought affects the health and performance of UK levees. You will explore how environmental stressors compromise levee