Sort by
Refine Your Search
-
ongoing research, addresses many complex issues, such as the existence, uniqueness, and regularity of solutions. However, to advance to the next stages—building numerical algorithms, conducting computations
-
monitoring. Proficiency in advanced visualization methods such as shadowgraphy, wire mesh sensors, high-speed imaging, and gas analysis tools is also expected. • Computational and Numerical Modeling: A strong
-
physical sciences or a related field which was awarded not earlier than in 2018 and specialize in computational (analytical and/or numerical) electrodynamic and/or nanophotonics. – Good knowledge
-
Research Framework Programme? Not funded by a EU programme Is the Job related to staff position within a Research Infrastructure? No Offer Description COMPETITION ANNOUNCEMENT Director of the Institute
-
) Positions Postdoc Positions Country Poland Application Deadline 2 Dec 2025 - 23:59 (Europe/Warsaw) Type of Contract Temporary Job Status Full-time Is the job funded through the EU Research Framework Programme
-
Framework Programme? Not funded by a EU programme Reference Number CeNT-49-2025 Is the Job related to staff position within a Research Infrastructure? No Offer Description Director of Centre of New
-
possibility to shape one's career in academia (both on theoretical - method development, scientific software development - and practical - computational modeling - research questions), as well as outside
-
the EU Research Framework Programme? Other EU programme Is the Job related to staff position within a Research Infrastructure? No Offer Description Konkurs na stanowisko Assistant Professor, Wydział
-
(Synthesis of mRNA by IVT method) is a big advantage; The candidate has to comply with the non-compete policy in accordance with the WIB Program guidelines Additional Information Benefits Stimulating and
-
Starting Date 1 Jan 2026 Is the job funded through the EU Research Framework Programme? Not funded by a EU programme Is the Job related to staff position within a Research Infrastructure? No Offer