-
research, in and outside academia. The focus for the PhD work will be probabilistic structural lifetime estimation of offshore dynamic riser and power cable systems by use of continuous measurements
-
in demand and are building engineer-to-order ships, platform modules, or steel substructures for offshore wind farms across large parts of the world. A critical knowledge gap exists in the planning and
-
structured way, set goals and make plans to achieve them. Engage actively in collaborative settings and contribute constructively with feedback and discussion. Demonstrate resilience and the ability to work
Searches related to offshore structure
Enter an email to receive alerts for offshore-structure positions