Sort by
Refine Your Search
-
Listed
-
Category
-
Country
-
Field
-
standard bank holidays and five university closure days including closure between Christmas and New Year. Our reward scheme grants bonuses of numerous values for excellent work We are committed to staff
-
with five partners. The focus of the doctoral program is the analysis of the spatial and temporal variability of decontamination efficiency in different soil materials on a flow cell scale. The results
-
. This project is intended to perform numerical studies and develop a methodology for the numerical analysis aimed at the effective damping of resonance regimes in bladed disks of gas-turbine engines using
-
The research project focuses on advancing seismic resilience strategies for industrial facilities by integrating and validating base isolation techniques. The doctoral candidate will numerically and
-
concretely your work package, for the preparation of a doctorate, contains: Are you a bioinformatician interested in how genetic differences influence cell development? Join us as a PhD candidate at the
-
shift in the world of hardware design. On the one hand, the increasing complexity of deep-learning models demands computers faster and more powerful than ever before. On the other hand, the numerical
-
the field.Vacancy 1: PhD (4 years) on experimental and numerical characterization of composites processing for hydrogen tanks[Net salary (after taxes) starting from 2600 EUR/month]Belgium has been taking a leading
-
-cutting and bending to break the glass panels. The project will involve the establishment of a numerical model and the acquisition and analysis of data from physical measurements in the production
-
in thermodynamics, optimization, and control theory. Strong understanding of mathematical modeling, numerical optimization, and/or model predictive control (MPC). Experience working with large-scale
-
of monopiles and jackets to depths of 80–100 m. Such solutions for these greater-than-standard depths should provide viable fixed-bottom designs to unlock numerous offshore sites with gigawatts of wind energy