-
the predicted starting date in October 2025, on an exclusive basis eventually renewable but never exceeding the end of the project. If it is not possible to ensure the duration of 6 months estimated in
-
article 8 of Regulation No. 487/2020, of May 22. The Doctorate Initial level, in abstract, is responsible for carrying out the activities foreseen in no. 2 of art. 7 of Regulation no. 487/2020, of May 22nd
-
basis eventually renewable but never exceeding the project duration. If it is not possible to ensure the duration of 4 months estimated in the previous paragraph, this duration will be adjusted according
-
the performance of activities corresponding to the category of Doctorate Initial level, as stated in article 8 of Regulation No. 487/2020, of May 22. The Doctorate Initial level, in abstract, is responsible