Sort by
Refine Your Search
-
a relevant field (business, computer technology, or database management) may offset qualifying experience, as would an associate’s degree (2:1 basis (college:experience). Must possess strong
-
to remove legacy items from EBNN Areas. Following BNL processes, properly dispose of research material and equipment (glass containers, tools, instrumentation, computers, carts, gas cylinders, lecture bottles
-
. The directorate includes the Accelerator Science & Technology Department, the Instrumentation Department, the Superconducting Magnet Division (SMD), and the being-formed Quantum Information Science and Technology
-
. Knowledge of BNL practices, policies, and procedures. Environmental, Health & Safety Requirements: The incumbent will occasionally work protracted or irregular hours. Computer/keyboard work is an essential
-
offers a comprehensive Benefits program that addresses immediate and long-term needs of our associates- from medical, dental, vision care and life insurance coverage to retirement income and more. Position
-
sciences, and nanoscience. To support this program, the NSLSII must design, fabricate, assemble, test, install, and operate unique research equipment to generate, transport, transfer, accelerate and focus
-
ongoing projects related to instrumentation and infrastructure for quantum computing. We invite eligible applicants for this position with the possibility to extend as needed by the project. This position
-
in marine engineering or similar technical degree; or completion of US Navy, multi-year union, or similar technically accredited program leading to a recognized certificate or license for the operation
-
Apply Now Job ID JR101897Date posted 07/07/2025 The Condensed Matter Physics and Materials Science Division (CMPMSD)at Brookhaven National Laboratory conducts a wide-ranging research program
-
to take a leading role in studying the origin of Lambda hyperon transverse polarization in electron scattering experiments—such as the CLAS12 experiment at Jefferson Lab’s 12 GeV program and the ePIC