Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Field
-
and their suitability to the research objectives of C-MAST. 9.1. Preferred elements for selection: Demonstration of proven knowledge on study and analysis of atomization processes of electrohydrodynamic
-
. - Numerical simulation of different use cases (beams, columns, blocks, 3D printed elements). - Collaboration in the structural analysis of full-scale prototypes. - Preparation of scientific papers, technical
-
data analysis, as well as participate in the preparation of scientific reports and manuscripts. BIs awarded to MSc who attend courses that do not confer an academic degree can only be granted for a
-
numerical simulation; - Have a suitable profile for the development of work with a strong experimental component, as well as knowledge of techniques such as tensile and flexural mechanical testing
-
of the eligibility of applications based on the admission requirements defined in point 3. Curriculum analysis of eligible candidates, with a rating from 0 to 20, based on the following criteria: Ranking
-
of the biological activity of the compounds and functional materials. Additionally, develop and apply advanced analytical methodologies, namely chromatography and mass spectrometry techniques, for the analysis
-
indicated in point 4. Work plan: The main objective of the work is the processing and analysis of suspected adverse drug reactions. It will involve the following aspects: (a) participation in
-
-degree course). - Experience in fluorescence microscopy and image analysis. - Experience in analysing neuronal morphology and synaptic alterations BIs awarded to MSc who attend courses that do not confer
-
Objectives and Work plan - Through the application of surveys, interviews and document analysis, to characterize in the context of the University of Beira Interior the environmental literacy of students
-
. Finally, a Life-Cycle Assessment (LCA) and Life-Cycle Cost (LCC) analysis will be conducted to evaluate the environmental impact and costs associated with implementing the modular platform. Work plan