Sort by
Refine Your Search
-
Country
-
Employer
-
Field
-
PREDICTIVE AI/ML SOLUTION APPLIED TO PROCUREMENT AND PRODUCTION MANAGEMENT” (REF COMPETE2030-FEDER- 01474600), AT FACULDADE DE ECONOMIA DA UNIVERSIDADE DO PORTO (FEP) The Faculty of Economics of the University
-
. Grant duration: Initial duration of 6 months, with the predicted starting date in December 2025, on an exclusive basis, renewable, but not exceeding the project duration. The eventual renewal
-
of Professor Fernando Jorge Lino Alves. Grant duration: Initial duration of 6 months, with the predicted starting date in November 2025, on an exclusive basis eventually renewable but never exceeding the end
-
the following conditions: Work Plan: The work to be developed is part of a research line focused on predicting high utilization of healthcare services (High Utilizers – HU) within the ULS Almada-Seixal, using
-
of Engineering of the University of Porto (FEUP), under the scientific supervision of Professor Luís Jorge Lima Ferrás. Grant duration: Initial duration of 3 months, with the predicted starting date in November
-
the predicted starting date in November 2025, on an exclusive basis, eventually renewable but never exceeding the project duration. If the contracting procedures do not allow the scholarship to have the minimum
-
results achieved at Year 12. Applicants enrolled in IB are assessed on the total number of SL and HL course grades achieved or predicted, and any NZQA Scholarship results achieved at Year 12. Accepting your
-
the following conditions: Work Plan: The work to be developed is part of a research line focused on predicting high utilization of healthcare services (High Utilizers – HU) within the ULS Almada-Seixal, using
-
, investment project no. 54, team, in the context of PPS14: Quality control predictive system for soldering, PRR-GA-PPS14-DIGI2, namely developing supervised R&D works, monitoring technical meetings with
-
the University of Porto (FEUP), under the scientific supervision of Professor António Fidalgo do Couto. Grant duration: Initial duration of 7 months, with the predicted starting date in November2025, on