Sort by
Refine Your Search
-
Listed
-
Country
-
Employer
- FEUP
- University of Porto
- Associação do Instituto Superior Técnico para a Investigação e Desenvolvimento _IST-ID
- Associação Fraunhofer Portugal Research
- Center for Theoretical Physics PAS
- Cranfield University
- Faculdade de Medicina da Universidade do Porto
- La Trobe University
- Trent University
- Universidade do Minho - CTAC
- University of Trás-os-Montes and Alto Douro
- 1 more »
- « less
-
Field
-
, with the predicted starting date in october 2025, on an exclusive basis eventually renewable but never exceeding the project duration. If it is not possible to ensure the duration of 6 months estimated
-
of Engineering of the University of Porto (FEUP), under the scientific supervision of Professor António José Coelho Dias Arêde. Grant duration: Initial duration of 12 months, with the predicted starting date in
-
the predicted starting date in September of 2025, on an exclusive basis eventually renewable for equal periods, in any case confined to the project duration. If the contracting procedures do not allow
-
. DURATION OF THE RESEARCH GRANT The research grant will last for 8 months, with a provisional starting date in December2025. The grant may be renewed until the maximum predicted in the project and/or
-
(technical personnel and toilet users), implementing AI-driven data analytics for system optimization, and creating predictive models for environmental and social impact assessment. Students will work with
-
. Grant duration: Initial duration of 6 months, with the predicted starting date in october 2025, on an exclusive basis eventually renewable but never exceeding the end of the project. If it is not possible
-
the predicted starting date in October 2025, on an exclusive basis, eventually renewable but never exceeding the project duration. If the contracting procedures do not allow the scholarship to have a minimum
-
duration of 6 months, with the predicted starting date in October 2025, on an exclusive basis eventually renewable, but never exceeding the end of the project. If it is not possible to ensure the duration