Sort by
Refine Your Search
-
Listed
-
Employer
-
Field
-
“New predictive AI/ML solution applied to procurement and production management” (refª COMPETE2030-FEDER- 01474600), IN PROGRESS AT THE FACULTY OF ECONOMICS OF THE UNIVERSITY OF PORTO (FEP) The Faculty
-
), for the project “New predictive AI/ML solution applied to procurement and production management” (refª COMPETE2030-FEDER- 01474600), IN PROGRESS AT THE FACULTY OF ECONOMICS OF THE UNIVERSITY OF PORTO (FEP
-
), for the project “New predictive AI/ML solution applied to procurement and production management” (refª COMPETE2030-FEDER- 01474600), IN PROGRESS AT THE FACULTY OF ECONOMICS OF THE UNIVERSITY OF PORTO (FEP
-
Sara Maria Pinho Ferreira. Grant duration: Initial duration of 6 months, with the predicted starting date in October 2025, on an exclusive basis eventually renewable but never exceeding the project
-
signing the contract. Activity Outline: The Health24towers project aims to research and develop an intelligent and predictive monitoring system for telecommunications tower infrastructure. The proposed
-
, with the predicted starting date in october 2025, on an exclusive basis eventually renewable but never exceeding the project duration. If it is not possible to ensure the duration of 6 months estimated
-
of Engineering of the University of Porto (FEUP), under the scientific supervision of Professor António José Coelho Dias Arêde. Grant duration: Initial duration of 12 months, with the predicted starting date in
-
. DURATION OF THE RESEARCH GRANT The research grant will last for 8 months, with a provisional starting date in December2025. The grant may be renewed until the maximum predicted in the project and/or
-
the predicted starting date in September of 2025, on an exclusive basis eventually renewable for equal periods, in any case confined to the project duration. If the contracting procedures do not allow
-
. Grant duration: Initial duration of 6 months, with the predicted starting date in october 2025, on an exclusive basis eventually renewable but never exceeding the end of the project. If it is not possible