Sort by
Refine Your Search
-
Listed
-
Category
-
Employer
-
Field
-
of Oslo. Starting date as soon as possible, preferably by October 1st 2025. The fellowship period is 3 years. No one can be appointed for more than one Postdoctoral Research Fellowship at the University
-
of Oslo. Starting date no later than October 1st, 2025. The fellowship period is 3 years. A fourth year may be considered with a workload of 25 % that may consist of teaching, supervision duties, and/or
-
position as a PhD Research Fellow in Meteorology/ Climate Science is available at the Department of Geoscience in the Section for Meteorology and Oceanography. No one can be appointed for more than one PhD
-
of security of supply (energy availability, power capacity, reliability of supply and voltage quality), as well as power flow balancing, and dynamic system integration) in regional distribution grids
-
experiments of a synthetic system. These droplets are found in a wide range of cellular processes and play a role in infections, cancer and diseases. The PhD work will involve theoretical and computational
-
learning Apply for this job See advertisement About the position Integreat – Norwegian Centre for Knowledge-driven Machine Learning is seeking a motivated PhD candidate in machine learning, knowledge
-
available at the Department of Geoscience in the Section for Meteorology and Oceanography. No one can be appointed for more than one PhD Research Fellowship period at the University of Oslo. Starting date
-
experiments. It is planned that the numerical simulations and experiments will help advance our understanding of these membrane wetting dynamics. The PhD research fellowship will be part of the group of Prof
-
of Oslo. Starting date no later than October 1st, 2025. The fellowship period is 3 years. A fourth year may be considered with a workload of 25 % that may consist of teaching, supervision duties, and/or
-
at the Department of Earth Science. The position is for a fixed-term period of three years and is affiliated with the project “Source–Sink Dynamics of the northeastern North Sea region”, financed by Vår Energi and