-
and tourism. The recruited person will carry out the following tasks: • Application of distributed hydraulic and hydrological models to simulate water behaviour and sediment transport in the pilot
-
Characterization of Graphene Derivatives. b) Duration of the contract: The contract is indefinite, but its duration is estimated until the end of the budget item on 30/06/2025. The distribution of tasks is as
-
response of different systems of interest will be evaluated. Justification for the duration of the contract: The tasks to be performed throughout the contract are distributed according to the following work
-
pumps, valves, water tanks, pipes, level sensors, and flow meters. - Support to perform calculations to determine the size and capacity of the pipes needed for the water distribution system. JUSTIFICATION