Sort by
Refine Your Search
-
Listed
-
Employer
- University of Trás-os-Montes and Alto Douro
- Universidade de Coimbra
- FEUP
- Associação do Instituto Superior Técnico para a Investigação e Desenvolvimento _IST-ID
- Faculty of Sciences of the University of Porto
- University of Aveiro
- University of Porto
- Instituto Politécnico de Bragança
- Instituto Politécnico de Coimbra
- Instituto Superior Técnico
- Instituto Superior de Agronomia
- NOVA.id.FCT- Associação para a Inovação de Desenvolvimento da FCT
- Instituto Politécnico de Setúbal
- Instituto de Telecomunicações
- UNIVERSIDADE DE ÉVORA
- Associação Fraunhofer Portugal Research
- COFAC
- ESS - Escola Superior de Saúde
- Escola Superior de Design, Gestão e Tecnologias da Produção de Aveiro - Norte da Universidade de Aveiro
- FARM-ID - Associação da Faculdade de Farmácia para a Investigação e Desenvolvimento
- Faculdade de Ciências Médicas|NOVA Medical School da Universidade NOVA de Lisboa.
- INESC TEC
- Instituto Nacional de Investigação Agrária e Veterinária, I.P.
- Instituto Nacional de Saúde Dr. Ricardo Jorge
- Instituto Politécnico do Cávado e do Ave
- Instituto de Engenharia Mecânica
- NOVA FCT
- Universidade Aberta
- Universidade Católica Portuguesa - Porto
- Universidade Nova de Lisboa
- Universidade do Minho - CTAC
- 21 more »
- « less
-
Field
-
in an industrial context. 3. BRIEF PRESENTATION OF THE WORK PROGRAMME AND TRAINING: The high demand for energy production, especially in offshore environments, raises environmental concerns
-
Research Studentships (for students of a Master or Integrated Master students) - (BL202/2025-IST-ID)
Associação do Instituto Superior Técnico para a Investigação e Desenvolvimento _IST-ID | Portugal | about 2 months agoInstance Learning (MIL) methodology. Although the results obtained are generally acceptable, we have observed that CNN performance declines in certain specific situations. Specifically, in cases where
-
confer an academic degree at the time of the contract, with an initial duration of 6 months, possibly renewable for a total period of 12 months, with a start date scheduled for October 2025. 2. WORK PLAN
-
Infrastructure? No Offer Description Work Plan: • State-of-the-art survey in language models (LLMs), vision and language models (LVLMs), and trusted AI. • Establishment of the model evaluation setup in
-
the requirements and conditions relating to this call in the notice provided at the link above. Work Location(s) Number of offers available1Company/InstituteUniversity of Aveiro - Research Centre on Didactics and
-
to this call in the notice provided at the link above. Work Location(s) Number of offers available1Company/InstituteUniversity of Aveiro - Research Centre on Didactics and Technology in the Education of Trainers