Sort by
Refine Your Search
-
Listed
-
Field
-
funded by a EU programme Is the Job related to staff position within a Research Infrastructure? No Offer Description This fixed-term contract is part of the SWOT space mission and the DIEGO-B project
-
a EU programme Is the Job related to staff position within a Research Infrastructure? No Offer Description As part of the RICOCHET [https://ricochet-anr.github.io/ ] project funded by the French
-
spectroscopy and AFM microscopy. · Macroscopic or local measurements of surface potentials using electrochemical techniques or Kelvin probe microscopy (KPFM) · Project carried out as part of an ANR project in
-
Jan 2026 Is the job funded through the EU Research Framework Programme? Horizon Europe - ERC Is the Job related to staff position within a Research Infrastructure? No Offer Description As part of
-
Framework Programme? Not funded by a EU programme Is the Job related to staff position within a Research Infrastructure? No Offer Description As part of this postdoctoral research, capillary debinding will be
-
-electrochemical atomic emission (AESEC) studies. Collaboration with partner laboratories for alloy synthesis and complementary investigations will be an integral part of the work. 1. Alloy Fabrication
-
, the latter undergoing temporary masking of part of their visual field. The protocol will combine several types of measurements: 1) behavioral (psychophysical) assessments, 2) functional neuroimaging recordings
-
Programming is a set of technologies underpinning much of modern logistics and manufacturing. The simplex method is one of the key algorithmic components of any MILP software package. This algorithm is known
-
at the ICARE laboratory, the candidate will have a primarily experimental role as part of the European HE MP2S (Modular Pulsed Propulsion System) project on low-power pulsed electric propulsion for satellites
-
part of a European project gathering chemical companies and academic labs, regular working meetings, either remotely or in person, will take place to ensure the smooth progress of the research project