Sort by
Refine Your Search
-
work is part of a study of different strategies for manufacturing chiral metal nanoclusters of different sizes, metal compositions and degrees of chirality (intrinsic and induced). The main objective
-
the development of a phase-field model to study the mechanisms of formation and growth of tetrataenite (Ni-Fe with the L1₀ ordered structure) during cooling. The objective is to incorporate the presence
-
doctoral candidates many unique opportunities, including: • A 36 month project as Marie Sklodowska Curie trainee in one of the participating institutions with the objective of receiving a doctoral degree
-
project, the objective is to develop a new generation of photocatalysts based on carbon nitride derivatives for sustainable solar hydrogen production via water photolysis. The innovative approach relies
-
funded by a EU programme Is the Job related to staff position within a Research Infrastructure? No Offer Description Main Project Objective: Identify the most influential samples in a dataset, particularly
-
. The objective of the thesis is to have a theoretical and numerical model of a free-surface flow on an erodible bed, satisfactorily explaining two documented historical cases of flooding by river dike failure
-
the striatum. These structures are fundamental to the balance between deliberate actions and more automatic behaviors. The objective is to understand how their activity underlies the ability to adapt
-
and a lifetime compatible with operation at 1450°C (≈2700F) for long periods for internal engine components. The main objective of this thesis project carried out at IRCER is to optimize the PIP
-
PhD on 2D quantum photonics : towards neuromorphic applications with 2D ferroelectrics materials M/F
-of-plane ferroelectric domains. The goal of this PhD is to optically detect, track, and ultimately control the ferroelectric state in such materials. Key objectives include imaging ferroelectric domains in a
-
prospects for improving energy efficiency and decentralization (adaptation to local energy sources). There is no universally optimal cycle; optimality depends on precise specifications defining the objectives