Sort by
Refine Your Search
-
TEC. 2. OBJECTIVES: This grant, within the scope of the EuroCC2 project, has as its main objectives the research and development of new features for the Intel SPDK (Storage Performance Development Kit
-
selection of sensors and their respective lighting to be adopted.; 3. Study and development of algorithms for detecting inconsistencies.; 4. Study and implementation of operator interfaces.; 5. Assembly and
-
://www.inesctec.pt/pagamento-propinas-bolseirosEN ) The grant holder will benefit from health insurance, supported by INESC TEC. 2. OBJECTIVES: - Development and testing of algorithms and methodologies based
-
benefit from health insurance, supported by INESC TEC. 2. OBJECTIVES: Research and develop novel reliable deep learning computer vision algorithms for the detection and quantification of GIM lesions
-
are to research and develop new features for the Intel SPDK platform (Storage Performance Development Kit). More specifically, we are looking for new scientific contributions that:; 1) improve the platform's
-
://www.inesctec.pt/pagamento-propinas-bolseirosEN ) The grant holder will benefit from health insurance, supported by INESC TEC. 2. OBJECTIVES: - Development and testing of algorithms and methodologies based
-
that provides AI-based suggestions. The work will consist in the improvement and evolution of previously developed models, as well as interacting with project partners to integrate algorithms and conduct field
-
. Implementation of signal detection algorithms and triangulation ; 4. Planning and participating in field tests to evaluate system performance; 5. Reporting and disseminating the work developed (ideally with a
-
suitable voltage and frequency control strategies, based on state-of-the-art research, and development of dispatch algorithms for the isolated microgrid, considering the coordinated control of generation
-
technological dissemination initiatives, particularly in the field of Physical or Electrical Engineering . Development of algorithms, support for the installation of the DAS, and real-time event monitoring. WORK