- 
                
                
                of the Strategic Resource Options being developed by the water companies. These options overlook the potential of floodwater reuse despite its increasing availability and hazard due to climate change induced 
- 
                
                
                the structure and resulting inundation – requires advanced modelling techniques. This research proposes to leverage CFD and DEM to develop an optimised methodology for designing and locating PBs specifically 
- 
                
                
                . Reliable, high-resolution rainfall data is urgently needed to improve flood prediction, climate adaptation, and infrastructure resilience. This project will tackle that challenge by developing a new blended 
Searches related to algorithm development
  Enter an email to receive alerts for algorithm-development positions in Uk