Sort by
Refine Your Search
-
Listed
-
Category
-
Country
-
Program
-
Field
-
operators for these notions. Over the past fifty years, such non-classical logics have proved vital in computer science and logic-based artificial intelligence: after all, any intelligent agent must be able
-
to agent-based and computable general equilibrium modeling, led by five team members. The first three pillars concern the development of computational agent-based models to explore three different channels
-
-Service (MaaS) ecosystem. The work will integrate deep reinforcement learning, autonomous agent modelling, and multi-objective optimization to enable predictive simulation, real-time resource management
-
Instituto de Investigação e Inovação em Saúde da Universidade do Porto (i3S) | Portugal | 6 days ago
combination with immune checkpoint inhibitors, and determine the impact of combination therapy versus each agent alone on lymphoma growth. Since anthracycline chemotherapeutic drugs can induce immunogenic cell
-
costs. The project focuses on Europe, with a detailed analysis of three selected case-study regions. Methodologically, SPHINX embraces five pillars, ranging from data collection to agent-based and
-
-tracking, behavioural data). Your team You will collaborate with several GRS colleagues who have expertise in methods and tools for spatiotemporal analysis of complex land systems (including agent-based
-
to any changes in the network, be robust in the face of uncertainty, and remain flexible. In recent years, new strategies for the optimal management of distributed systems, based on analysis, simulation
-
The focus of the project is artificial intelligence (AI) and its relation to robotics and embodiment. Embodiment plays a significant role in learning in AI by enabling cognitive agents to acquire actively
-
position within a Research Infrastructure? No Offer Description Location: Mohammed VI Polytechnic University (UM6P) Duration: [12–24 months, renewable based on performance] Start Date: 01-09-2025 Field
-
Manager of any slippage in critical path time, makes recommendations on accepting the contractor's proposed schedule recovery plan, and maintains an annotated copy of the schedule that reflects actual