Sort by
Refine Your Search
-
Listed
-
Field
-
component classifications. Develop and/or review Manufacturing Plan, Inspection and Test plan and other fabrication deliverables to define, validate, and maintain requirements for complex optical-electrical
-
as well as the broader Princeton community to design, develop, and maintain the Facilities data strategy, ecosystem, and integrations environment. The Assistant Director also works closely with
-
The Assistant Director of Data Strategy and Integration partners with stakeholders in Facilities as well as the broader Princeton community to design, develop, and maintain the Facilities data
-
manufacturing documentation, including Statements of Work, technical specifications, procurement descriptions, and component classifications. Develop and/or review Manufacturing Plan, Inspection and Test plan and
-
the academic mission of the University by designing, developing, and maintaining applications and services that enhance teaching and learning. The Application Developer will build and maintain interactive
-
high-voltage 69 kV substation equipment to low-voltage 24 Vdc plant control systems. The assistant engineer will assist a senior engineer in managing electrical projects using campus design standards
-
design, procurement, commissioning, operation, and management of electrical power systems and associated equipment to join our staff in the Facilities Engineering Division. The successful candidate is
-
of genetically modified vertebrate animals (e.g., CRISPR editing; design, embryo injections, screening), complex molecular biology (e.g., cloning, immunostaining, qPCR, western blots), microscopy, as
-
courses in place of traditional introductory physics and mathematics. These courses immerse students in design, prototyping, problem-solving, and entrepreneurial thinking from their first semester. The
-
the Facilities Organization , the Executive Director, Project Management (Design and Construction) will play a critical role within the Office for Capital Projects (OCP) in executing on the Capital Plan projects